Google translated from
http://www.travaux-tram-lemans.fr/
Following the success of the T1 tram line launched in 2007, a second phase is set up to enhance the ease of movement in our city. It concerns the rallying neighborhoods Coulaines and Allonnes.
1 -
T2 line: Coulaines connect downtown with the extension of the tram line
The new tram line from senior Bellevue, Mallets and descends through the Cross by Peter passes on the Place des Jacobins and just connect to the existing tram line at the Prefecture.
2 -
T3 line: Allonnes link to North Station with the introduction of the line of Bus with High Level of Service (BRT)
This bus rally center and multimodal Allonnes the Gare Nord optimally. In effect it will have its own lane on most of the route and will have priority over general traffic.
This work, conducted and produced by SEM-group TRANSAMO in the name and on behalf of Le Mans Métropole, began December 16, 2011 for the T2.
Commissioning of the new network (T2 + T3) is scheduled for the
second half of 2014.
http://www.facebook.com/photo.php?fb...type=1&theater