Quote:
Originally Posted by Gingers4Justice
Anyone seen the drawings for the extended run off at the first right hander at the Porsche curves? It looks over-ambitious to me. If the plans are correct, then the road leading the Beausejour will have to be wiped and a new one found somewhere else.
|
Are they talking about where they leave the public road, which is a right hander. Looking at Google maps, there is already a gravel trap there, and what looks like one of the circuits car parks. I could see them pushing back into that park to make a deeper (longer?) gravel trap. That's a bit before the track crosses over D92.
Just past the crossing, there looks to be room, drivers right, to push armco back towards access road.