Quote:
Originally Posted by ScotsBrutesFan
Is the long straight tunnelling or dredging the earlier section of track?
As drawn it appears to be tunnel but there isn't much space from a tunnel exit to pit entry.
|
tunnelling, gap between tunnel exit and pit in is 200m.